
Rezé2025
Roof renewed, dormer restored
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles · 12 days
Once the scaffolding came down
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Good to know
We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.
Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.
For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.
A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.
Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.
It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.
Tell us what worries you, even roughly. We call you back to arrange a visit, free of charge.
You would rather talk? Call the workshop on01 23 45 67 89
A family firm, a workshop in town and the same phone number for over twenty years. We come and look, we say what needs doing, and what can wait.

over 1,200 roofs
done within 20 km of the workshop
Why they call us back
A ten-year guarantee is only worth what the company behind it is worth. Ours has had the same workshop, the same name and the same trade for more than twenty years.
Ten-year insurance
The certificate comes with every quote.
RGE certified
The condition for insulation grants.
Safety before climbing
Scaffolding or guardrails in place before the first tile comes off.
Site left clean
Old tiles and offcuts taken away, gutters emptied.
What we do up there

Tiles blown off, a branch through the roof: we make it watertight the same day and document everything for your insurer.
from €290Storm call-out

A stain on the ceiling rarely sits under the leak. We find where the water really gets in, then repair only what needs repairing.
from €180Storm call-out

Clay tiles, battens and underlay renewed, the rafters checked on the way: a roof done for the next fifty years.
from €120 per m²

Natural slate, hooked or nailed, laid by hand: the roof of the region, for the life of the house.
from €160 per m²

Gutters, downpipes, flashings and ridge in zinc, shaped and soldered on site to fit your roof.
from €55 per metre

Moss removed by hand and a treatment applied, only when the roof needs it. We tell you when it does not.
from €18 per m²
Our patch
The towns where we work every week. Outside them, ask anyway: we may know a colleague.
Carquefou
44470
La Chapelle-sur-Erdre
44240
Nantes
44000
Orvault
44700
Rezé
44400
Saint-Herblain
44800
Saint-Sébastien-sur-Loire
44230
Vertou
44120

Recent jobs
Roofs you can go and look at, in the towns next door.

Rezé2025
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles · 12 days

Orvault2025
A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.
Natural slate, hooked · 4 weeks

Nantes2024
A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.
Natural zinc · 9 days

Carquefou2025
A dark loft turned into two bedrooms, three windows cut into the tiled slope.
Roof windows and flashing kits · 3 days

Vertou2024
Rotten rafters found when stripping the roof, replaced before the new covering went on.
Treated softwood · 6 days

Saint-Sébastien-sur-Loire2024
Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.
Reclaimed canal tiles · 8 days
From the first call to the handover
We climb onto the roof before pricing anything, and send you the photos of what we saw.
Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.
The roof is made watertight every evening, even halfway through the job.
We walk round the job with you and you sign the handover: the ten-year cover starts that day.