Your roofing company

Once the scaffolding came down

What the neighbours say

"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L.Storm tarping, Rezé
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M.Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V.Slate roof renewal, Carquefou

Good to know

Before you sign anything for your roof

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

Come and see my roof

Tell us what worries you, even roughly. We call you back to arrange a visit, free of charge.

You would rather talk? Call the workshop on01 23 45 67 89

Your neighbours' roofer

Half the roofs in this street, we laid them.

A family firm, a workshop in town and the same phone number for over twenty years. We come and look, we say what needs doing, and what can wait.

  • Known by name in the neighbourhood
  • The same team from start to finish
  • What can wait, we say so

over 1,200 roofs

done within 20 km of the workshop

Why they call us back

We will still be here in ten years

A ten-year guarantee is only worth what the company behind it is worth. Ours has had the same workshop, the same name and the same trade for more than twenty years.

Ten-year insurance

The certificate comes with every quote.

RGE certified

The condition for insulation grants.

Safety before climbing

Scaffolding or guardrails in place before the first tile comes off.

Site left clean

Old tiles and offcuts taken away, gutters emptied.

Our patch

Where we work

The towns where we work every week. Outside them, ask anyway: we may know a colleague.

Carquefou

44470

within 48 h

La Chapelle-sur-Erdre

44240

within 48 h

Nantes

44000

within 24 h

Orvault

44700

within 48 h

Rezé

44400

within 24 h

Saint-Herblain

44800

within 24 h

Saint-Sébastien-sur-Loire

44230

within 24 h

Vertou

44120

within 48 h

Recent jobs

Roofs we have done

Roofs you can go and look at, in the towns next door.

Rezé2025

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

Interlocking clay tiles · 12 days

Orvault2025

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

Natural slate, hooked · 4 weeks

Nantes2024

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

Natural zinc · 9 days

Carquefou2025

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

Roof windows and flashing kits · 3 days

Vertou2024

Rafters replaced before re-roofing

Rotten rafters found when stripping the roof, replaced before the new covering went on.

Treated softwood · 6 days

Saint-Sébastien-sur-Loire2024

Canal tiles re-laid on a stone house

Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.

Reclaimed canal tiles · 8 days

From the first call to the handover

How a roofing job goes

1

We come and look

We climb onto the roof before pricing anything, and send you the photos of what we saw.

2

A written, detailed quote

Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.

3

The work, on the agreed dates

The roof is made watertight every evening, even halfway through the job.

4

Handover and guarantee

We walk round the job with you and you sign the handover: the ten-year cover starts that day.